This is a two-story ground-up construction of a 24,539-square-foot tk-8th grade school. This project consists of 19 classrooms, support spaces, utility rooms, multi-purpose rooms, boys and girls lockers, elevator, EV charge stations, playground, green screen panels, canopies and soccer field.
DESIGNER: CSDA Design Group
Ground-up construction of a 10,380-square-foot preschool. The preschool includes an admin building, a classroom building, a covered courtyard, and a nature-inspired play area.
ARCHITECT: LPA Design Studios
FEATURES: LEED Platinum and Living Building Challenge 3 pedal certified, Photovoltaic system on the roof, design laser cut BOK panel fence, permeable paver parking lot, and car chargers in the parking lot.
This 119,270-square-foot three-story, steel and wood-framed, ground-up construction project consists of a fully-sprinklered building that accommodates 21 classrooms for students grades five through eight and an administration area. Scope of work also included a 4,447-square-foot gymnasium built with CMU blocks that houses a basketball court and volleyball court for the students.
ARCHITECT: Berliner Architects
The 14,000-square-foot, 2-story building includes six primary classrooms, three toddler classrooms, three offices, a meeting room, a kitchen, and a prep-kitchen. Construction also included the parking lot, site utilities, outside play area, landscape, and irrigation. Click the video below to see more on the project!
ARCHITECT: David Sheegog
Remodeled 5,495 square feet of the existing church chapel, bathrooms, offices, patio, and landscape. We added an additional 1,800 square feet, which included new restaurant quality kitchen, storage areas, meeting room & exterior trellis and playground.
ARCHITECT: J7 Architect
FEATURES: Restaurant grade appliances and playground.
A large entry and a courtyard featuring a baptismal pool. Consolidated Contracting Services, Inc. managed the construction of two new two-story buildings that feature outdoor play area for kids and a social area for adults. A pedestrian bridge connects the buildings and allows access from the classroom and meeting center to the larger multipurpose room and computer center. The first building houses a Community Wellness Clinic, a large classroom, community meeting room and kitchen area. The second building houses career development and vocational skill-building classrooms, job training and youth centers. Work included landscaping, structural steel moment frame, very large footings, conventional wood framing, stucco finish, ceramic tile walkways, fire sprinkler lines, and underground utilities.
Contact us today at (949) 498-7500 and tell us your ideas.
Address
181 Avenida La Pata Suite 200 San Clemente, CA 92673
Phone: (949) 498-7500
Fax: (949) 498-7992
Licenses:
California B# 475813
Arizona B# 184208
Nevada B# 0068012